UNB Fredericton Construction Map Archive
Construction Project
Project Title: Forestry & Geology Freight Elevator
Estimated Start Date: May 09, 2022 04:00 am
Estimated End Date: Sep 30, 2022 04:00 am
Details:
Replace/Modify existing freight elevator to a passenger elevator.Construction Project
Project Title: Demolition of Incutech #3
Estimated Start Date: May 02, 2022 04:00 am
Estimated End Date: Jul 29, 2022 04:00 am
Details:
Demolition of BuildingConstruction Project
Project Title: BMO Field - Synthetic Turf Field Replacement
Estimated Start Date: Jun 13, 2022 04:00 am
Estimated End Date: Jul 31, 2022 04:00 am
Details:
Remove and replace Synthetic Turf FieldConstruction Project
Project Title: Wu Centre - Renovate Marketing & Communications Space
Estimated Start Date: May 24, 2022 04:00 am
Estimated End Date: Jul 15, 2022 04:00 am
Details:
Wu Centre Renovate Marketing & Communications SpaceConstruction Project
Project Title: Enterprise #1 - Masonry Repairs
Estimated Start Date: May 16, 2022 04:00 am
Estimated End Date: Jul 04, 2022 04:00 am
Details:
Masonry Repairs to Main EntranceConstruction Project
Project Title: IUC Science Library & Forestry Geology - Entrance Renewal
Estimated Start Date: Jun 27, 2022 04:00 am
Estimated End Date: Aug 26, 2022 04:00 am
Details:
Repairs to ramp & entrance steps to West end of IUC Science Library, and repairs to East entrance of Forestry/Geology Building.Construction Project
Project Title: Marshall d'Avray - Renovations to Classroom 223
Estimated Start Date: Jun 08, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Renovate room 223 at Marshall d'Avray HallConstruction Project
Project Title: Capital Planning & Operations - PV Installation
Estimated Start Date: Jul 01, 2022 04:00 am
Estimated End Date: Aug 19, 2022 04:00 am
Details:
Install new solar (PV) system on sloped roof above main entranceConstruction Project
Project Title: IUC Central Core - PV Installation
Estimated Start Date: Jul 01, 2022 04:00 am
Estimated End Date: Aug 15, 2022 04:00 am
Details:
Install new solar (PV) system on the low sloped vegetative roof at IUC Central CoreConstruction Project
Project Title: Campus Grounds - Replace Various Path Light Bases & Fixtures
Estimated Start Date: Aug 01, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Selectively replace existing exterior path lighting near LB GYM, HIL, McConnell Hall and EPJ Res, including new fixtures and bases.Construction Project
Project Title: Magee House - Upgrade Apartments 201 & 202
Estimated Start Date: Jun 20, 2022 04:00 am
Estimated End Date: Aug 26, 2022 04:00 am
Details:
Replace flooring, kitchen cabinets, washroom fixtures, painting and new heating convectors.Construction Project
Project Title: Dineen Drive - Milling & Paving
Estimated Start Date: Jun 28, 2022 04:00 am
Estimated End Date: Jul 08, 2022 04:00 am
Details:
Milling and Paving Dineen Drive between gate and Head HallConstruction Project
Project Title: Aitken House - Complete Renovation
Estimated Start Date: Jun 28, 2022 04:00 am
Estimated End Date: Aug 31, 2023 04:00 am
Details:
Residence Renewal Program - Complete RenovationConstruction Project
Project Title: Toole Hall & IUC Forestry - Sidewalk Between
Estimated Start Date: Jun 27, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Sidewalk Upgrades between Toole Hall and IUC ForestryConstruction Project
Project Title: IUC Forestry - Rm 301 & 305 Replace Blinds
Estimated Start Date: Jun 29, 2022 04:00 am
Estimated End Date: Jul 30, 2022 04:00 am
Details:
Replace Blinds in Room 301 & 305Construction Project
Project Title: Keirstead Hall - Card Access
Estimated Start Date: Jun 01, 2022 04:00 am
Estimated End Date: Jul 15, 2022 04:00 am
Details:
Keirstead Hall - Card Access UpgradesConstruction Project
Project Title: Sir Howard Douglas Hall - Card Access
Estimated Start Date: Jun 01, 2022 04:00 am
Estimated End Date: Jul 30, 2022 04:00 am
Details:
Sir Howard Douglas Hall - Card Access UpgradesConstruction Project
Project Title: Toole Hall - Room 244 AV Upgrades
Estimated Start Date: Dec 01, 2022 05:00 am
Estimated End Date: Jan 30, 2023 05:00 am
Details:
Upgrades to AV in Room 244Construction Project
Project Title: Toole Hall - Pheonix Lab Control Upgrades
Estimated Start Date: Jul 04, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
Pheonix Lab Control UpgradesConstruction Project
Project Title: Bailey Hall - Pheonix Lab Control Upgrades
Estimated Start Date: Jul 04, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Pheonix Lab Control UpgradesConstruction Project
Project Title: ITC Computer Science - Renovate Room 215
Estimated Start Date: Jun 01, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
ITC Computer Science - Renovate Room 215Construction Project
Project Title: ITC Computer Science - Renovate Room 314
Estimated Start Date: Jun 01, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
ITC Computer Science - Renovate Room 314Construction Project
Project Title: Gillin Hall - GC111 Computer Lab Renovation
Estimated Start Date: Jun 20, 2022 04:00 am
Estimated End Date: Sep 30, 2022 04:00 am
Details:
Gillin Hall - GC111 Computer Lab RenovationConstruction Project
Project Title: Capital Planning & Operations - Replace Roof
Estimated Start Date: Jul 04, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
Capital Planning & Operations - Replace RoofConstruction Project
Project Title: Bailey Hall - 1st Year Biology Lab Upgrades
Estimated Start Date: Jun 01, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
Bailey Hall - 1st Year Biology Lab Upgrades - Phase IIConstruction Project
Project Title: IUC Physics - AH5 AC & Renewal
Estimated Start Date: Jul 11, 2022 04:00 am
Estimated End Date: Mar 31, 2023 04:00 am
Details:
Replacement of air handling unit#5, including AC and modification to existing air distributionConstruction Project
Project Title: R.N. Scott - Various Room Renovations
Estimated Start Date: Jun 17, 2022 04:00 am
Estimated End Date: Jul 31, 2022 04:00 am
Details:
R.N. Scott - Various Room RenovationsConstruction Project
Project Title: Singer Hall - Classroom S150 AV Upgrades
Estimated Start Date: Jun 17, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Singer Hall - Classroom S150 AV UpgradesConstruction Project
Project Title: Old Engineering - Classroom H224 AV Upgrades
Estimated Start Date: Jun 17, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Old Engineering - Classroom H224 AV UpgradesConstruction Project
Project Title: Law Building - Classrooms 2A, 2B, 14, & 15 AV Upgrades
Estimated Start Date: Jun 17, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Law Building - Classrooms 2A, 2B, 14, & 15 AV UpgradesConstruction Project
Project Title: Tilley Hall - Classroom T104 Seating & AV Upgrades
Estimated Start Date: Jun 20, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Tilley Hall - Classroom T104 Seating & AV UpgradesConstruction Project
Project Title: Magee House - Window Blinds
Estimated Start Date: Jun 01, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
Magee House - Window Blinds to replace existing window treatments with roller blinds through-out the facility.Construction Project
Project Title: IUC Physics - Rm 001 LA - Washroom Renovations
Estimated Start Date: Jul 04, 2022 04:00 am
Estimated End Date: Oct 31, 2022 04:00 am
Details:
IUC Physics - Rm 001 LA - Washroom RenovationsConstruction Project
Project Title: IUC Forestry - Rm 208 Kitchenette Upgrades
Estimated Start Date: Jul 15, 2022 04:00 am
Estimated End Date: Aug 30, 2022 04:00 am
Details:
IUC Forestry - Rm 208 Kitchenette UpgradesConstruction Project
Project Title: Head Hall - Renovations to Classroom E4
Estimated Start Date: Jun 29, 2022 04:00 am
Estimated End Date: Aug 31, 2022 04:00 am
Details:
Head Hall - Renovations to Classroom E4Construction Project
Project Title: LB Residence - Clock Tower Repairs and Window Painting
Estimated Start Date: Jul 18, 2022 04:00 am
Estimated End Date: Sep 30, 2022 04:00 am
Details:
Lady Beaverbrook Residence - Clock Tower Repairs and Window PaintingConstruction Project
Project Title: Toole Hall - Energy Conservation
Estimated Start Date: Jul 12, 2021 04:00 am
Estimated End Date: Oct 31, 2022 04:00 am
Details:
Toole Hall - Energy ConservationConstruction Project
Project Title: Sir Howard Douglas Hall - Rm 306 & 306A Flooring
Estimated Start Date: Jul 26, 2022 04:00 am
Estimated End Date: Aug 03, 2022 04:00 am
Details:
Sir Howard Douglas Hall - Rm 306 & 306A Refinish Hardwood FlooringConstruction Project
Project Title: Memorial Hall - Entrance Column Replacement
Estimated Start Date: Aug 03, 2022 04:00 am
Estimated End Date: Nov 15, 2022 05:00 am
Details:
Replacement of Columns at Main EntranceConstruction Project
Project Title: Harriet Irving Library - Masonry Repairs to Chimney
Estimated Start Date: Sep 05, 2022 04:00 am
Estimated End Date: Sep 30, 2022 04:00 am
Details:
Masonry Reconstruction of Chimney on Rear WingConstruction Project
Project Title: Enterprise #1 - Main Entrance Wall Cladding
Estimated Start Date: Sep 21, 2022 04:00 am
Estimated End Date: Oct 07, 2022 04:00 am
Details:
Install new concrete curbs for future wall cladding at main entrance stairs.Construction Project
Project Title: MacKay Drive across from Marshall d'Avray - Sidewalk Replacement
Estimated Start Date: Aug 19, 2022 04:00 am
Estimated End Date: Sep 05, 2022 04:00 am
Details:
Remove failing existing concrete sidewalk and replace with new concrete sidewalk.Construction Project
Project Title: Memorial Hall - Replace Stage Drapes
Estimated Start Date: Dec 15, 2022 05:00 am
Estimated End Date: Jan 31, 2023 05:00 am
Details:
Replacement of Stage Drapes and TracksConstruction Project
Project Title: Head Hall - D34 Soldering Exhaust
Estimated Start Date: Jan 02, 2023 05:00 am
Estimated End Date: Jan 31, 2023 05:00 am
Details:
Install 2 soldering exhaust arms in Lab D34Construction Project
Project Title: Tilley Hall - Renovations Room 221, 222, 222A & 222B
Estimated Start Date: Nov 21, 2022 05:00 am
Estimated End Date: Feb 28, 2023 05:00 am
Details:
Renovations for Tilley Hall Rooms 221, 222, 222A & 222BConstruction Project
Project Title: Harriet Irving Library - 5th Floor Renovations
Estimated Start Date: Dec 21, 2022 05:00 am
Estimated End Date: Apr 30, 2023 04:00 am
Details:
5th Floor RenovationsConstruction Project
Project Title: Sir Howard Douglas Hall - Rm 317 & 318 Flooring
Estimated Start Date: Jan 03, 2023 05:00 am
Estimated End Date: Feb 28, 2023 05:00 am
Details:
Refinish Hardwood Floors in Rooms 317 & 318Construction Project
Project Title: Alumni Memorial - Renovate President's Lounge
Estimated Start Date: Mar 15, 2023 04:00 am
Estimated End Date: Jul 31, 2023 04:00 am
Details:
Renovations to President's LoungeConstruction Project
Project Title: McConnell Hall - Walk In Cooler/Freezer Replacement
Estimated Start Date: May 01, 2023 04:00 am
Estimated End Date: Aug 18, 2023 04:00 am
Details:
Replace large walk in cooler & cooler/freezer combo.Construction Project
Project Title: Head Hall - Renovations to Rooms 218 & 229
Estimated Start Date: Apr 26, 2023 04:00 am
Estimated End Date: Aug 31, 2023 04:00 am
Details:
Renovate Rooms 218 & 229 at Head HallConstruction Project
Project Title: Tunnel Top Reconstruction
Estimated Start Date: May 22, 2023 04:00 am
Estimated End Date: Jul 31, 2023 04:00 am
Details:
80 feet of Tunnel Top Reconstruction at the intersection of Dineen Dr & Kings College Rd. For project duration, no through traffic on Dineen Dr between Law Building and Keirstead parking lot. Traffic to detour through Bailey Drive, MacKay Drive and Pacey Drive.Construction Project
Project Title: Keirstead Hall - Renovate Room 4
Estimated Start Date: May 15, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Renovate Room 4 at Keirstead HallConstruction Project
Project Title: Memorial Hall - Wheelchair Retaining Wall & Ramp
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Wheelchair Retaining Wall & RampConstruction Project
Project Title: Memorial Hall - Room 010 Exterior & Interior Renovations
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Dec 31, 2023 04:00 am
Details:
Room 010 Exterior & Interior RenovationsConstruction Project
Project Title: Student Union Building - Columns
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Dec 31, 2023 04:00 am
Details:
ColumnsConstruction Project
Project Title: Central Heating Plant - Replace Fuel Tank
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Dec 31, 2023 04:00 am
Details:
Replace Fuel TankConstruction Project
Project Title: Sir Howard Douglas Hall - Repointing of Stonework
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Repointing of StoneworkConstruction Project
Project Title: Kings College Entrance Gates - Masonry Repair
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Masonry RepairConstruction Project
Project Title: Bailey Greenhouse Link - Masonry Repair
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Masonry RepairConstruction Project
Project Title: Harriet Irving Library - Sprinkler Phase II
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Feb 29, 2024 04:00 am
Details:
Sprinkler Phase IIConstruction Project
Project Title: Memorial Hall - Room 23 Refinish Hardwood Floors
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Refinish Hardwood FloorsConstruction Project
Project Title: Annex C - Exterior Painting
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Exterior PaintingConstruction Project
Project Title: Muriel McQueen Fergusson Centre - Stain Exterior
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Stain ExteriorConstruction Project
Project Title: Bailey Hall - Room 244 & 261 Renovations
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Renovations to Rooms 244 & 261Construction Project
Project Title: Bank Bookstore - Renovate Room 10
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Renovations to Room 10 in BasementConstruction Project
Project Title: Marshall d'Avray - Remove Carpeting
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Carpet Removal in Rooms 124, 124B, 125B, and 249Construction Project
Project Title: Student Union Building - Replace Curtains & Track System
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Replace Curtains & Track System in Cafeteria & AtriumConstruction Project
Project Title: Magee House - Renovate Two Suites
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Renovate Two Suites - To Be DeterminedConstruction Project
Project Title: Lady Dunn - Cafeteria Dishroom Flooring Replacement
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Cafeteria Dishroom Flooring ReplacementConstruction Project
Project Title: Magee House - Replace Flooring in Two Hallways
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Replace Flooring in Two HallwaysConstruction Project
Project Title: Law - Renovations to 3rd Floor Library
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Renovations to 3rd Floor Library 303C, etc.Construction Project
Project Title: Wu Centre - Renovations to Room 229
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Renovations to Room 229 - War RoomConstruction Project
Project Title: Marshall d'Avray - Room 314E Washroom to Storage
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Room 314E Washroom to StorageConstruction Project
Project Title: Marshall d’Avray – Student Accessibility Centre Upgrades
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Student Accessibility Centre UpgradesConstruction Project
Project Title: Carleton Hall – Classroom 204-Full Renovation
Estimated Start Date: May 26, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Full Renovation to Classroom 204Construction Project
Project Title: Intersection of MacKay Drive and Pacey Drive
Estimated Start Date: Jun 01, 2023 04:00 am
Estimated End Date: Jun 09, 2023 04:00 am
Details:
Milling and Paving - Asphalt ResurfacingConstruction Project
Project Title: Carleton Hall - Classroom 139 Upgrade to Theatre
Estimated Start Date: Jun 01, 2023 04:00 am
Estimated End Date: Aug 31, 2023 04:00 am
Details:
Classroom 139 - Upgrade to TheatreConstruction Project
Project Title: Singer Hall - Classroom S351 Tech Upgrades
Estimated Start Date: Jun 01, 2023 04:00 am
Estimated End Date: Aug 31, 2023 04:00 am
Details:
Classroom S351 Tech UpgradesConstruction Project
Project Title: Forestry/Geology - Classroom FG104 Tech Upgrades
Estimated Start Date: Jun 01, 2023 04:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Classroom FG104 Tech UpgradesConstruction Project
Project Title: Singer Hall - Computer Lab 156 Divided into Two Spaces
Estimated Start Date: Jun 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Computer Lab 156 - Divided into Two SpacesConstruction Project
Project Title: Marshall d'Avray - Rm 230 Electrical Renovations
Estimated Start Date: Aug 14, 2023 03:00 am
Estimated End Date: Oct 31, 2023 03:00 am
Details:
Install new electrical panel and update electrical in room 230.Construction Project
Project Title: R N Scott Hall - Rm 114 Replace Flooring
Estimated Start Date: Jun 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Room 114 - Replace Carpet with LVT FlooringConstruction Project
Project Title: Incutech #1 - CNER Lab Renovations
Estimated Start Date: Jun 01, 2023 03:00 am
Estimated End Date: Oct 31, 2024 03:00 am
Details:
CNER Lab Renovations in Rooms 114, 200, 201, 202, & 204Construction Project
Project Title: Bailey Hall - Biol1000 Lab Renewal
Estimated Start Date: Jun 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Biol1000 Lab Renewal - Phase 4Construction Project
Project Title: Toole Hall - Lab 037 Renovation
Estimated Start Date: Jun 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Materials Science Lab 037 RenovationConstruction Project
Project Title: Alumni Memorial - Office Renovations
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Office Renovations to Rooms 1, 2, 3, 4, 5Construction Project
Project Title: Bank Bookstore - Room 106 Renovation
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Room 106 Renovation with Infill Above GlassConstruction Project
Project Title: Jones House - Redesign Front Reception Area
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Redesign Front Reception AreaConstruction Project
Project Title: Kinesiology - Solar Project
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Apr 30, 2024 03:00 am
Details:
Solar ProjectConstruction Project
Project Title: Memorial Hall - South Side Drain Tile and West & East Steps
Estimated Start Date: Jun 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Exterior Stair Replacement and Waterproofing & Drain TileConstruction Project
Project Title: IUC Physics - Alterations to Teaching Labs
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Alterations to Teaching Labs 304, 314, 321Construction Project
Project Title: IUC Central Core - Room 101 Upgrades
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Sep 29, 2023 03:00 am
Details:
Room 101 Upgrades to Acommodate FurnitureConstruction Project
Project Title: Old Engineering - H108 Washroom Renewal
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
H108 Washroom RenewalConstruction Project
Project Title: MacLaggan Hall - Door Access
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Door AccessConstruction Project
Project Title: Singer Hall - Door Access
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Door AccessConstruction Project
Project Title: Tilley Hall - Door Access
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Door AccessConstruction Project
Project Title: Carleton Hall - Door Access
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Door AccessConstruction Project
Project Title: Alumni Memorial - Door Access
Estimated Start Date: May 01, 2023 03:00 am
Estimated End Date: Aug 31, 2023 03:00 am
Details:
Door AccessConstruction Project
Project Title: R N Scott Hall - Installation of PTAC Units
Estimated Start Date: Oct 02, 2023 04:00 am
Estimated End Date: Dec 15, 2023 05:00 am
Details:
Installation of new PTAC Units in Room 219Construction Project
Project Title: Campus - Culvert on Peter Kelly Drive
Estimated Start Date: Oct 30, 2023 04:00 am
Estimated End Date: Nov 30, 2023 05:00 am
Details:
Culvert on Peter Kelly DriveConstruction Project
Project Title: Neville Jones House - Complete Renovation
Estimated Start Date: Oct 30, 2023 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Complete RenovationConstruction Project
Project Title: McLeod House - Building Demolition
Estimated Start Date: Feb 05, 2024 05:00 am
Estimated End Date: Jul 31, 2024 04:00 am
Details:
Demolition of BuildingConstruction Project
Project Title: Head Hall - Commons Addition
Estimated Start Date: Oct 30, 2023 04:00 am
Estimated End Date: May 31, 2024 04:00 am
Details:
Commons AdditionConstruction Project
Project Title: Student Union Building - Renovations to Main Floor
Estimated Start Date: Oct 30, 2023 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Renovations to Main FloorConstruction Project
Project Title: Old Engineering - Lab H1 Electrical Infrastructure
Estimated Start Date: Oct 30, 2023 04:00 am
Estimated End Date: Dec 31, 2023 05:00 am
Details:
Lab H1 Electrical InfrastructureConstruction Project
Project Title: Memorial Hall - Replace Theatre Lights
Estimated Start Date: Oct 30, 2023 04:00 am
Estimated End Date: May 01, 2024 04:00 am
Details:
Replace Theatre LightsConstruction Project
Project Title: Student Union Building Upper Parking Lot - Replace Lights
Estimated Start Date: Nov 01, 2023 04:00 am
Estimated End Date: Dec 31, 2023 05:00 am
Details:
Student Union Building Upper Parking Lot - Replace Remaining Parking Lot LightsConstruction Project
Project Title: Jones House - Columns
Estimated Start Date: Jul 15, 2024 04:00 am
Estimated End Date: Aug 01, 2024 04:00 am
Details:
ColumnsConstruction Project
Project Title: IUC Science Library - Masonry Repairs
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Jul 15, 2024 04:00 am
Details:
Masonry Repairs of the East stairwell/Entryway and front elevation of IUC Science Library. East entrance to be closed during repairs, please seek alternate routes around the jobsite or access via the West Entrance of IUC Science Library.Construction Project
Project Title: IUC Science Library - Grating Repairs
Estimated Start Date: May 06, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Resurface concrete landing and drain trough at the East Entrance of the IUC Science Library.Construction Project
Project Title: Marshall d'Avray - Classroom 321
Estimated Start Date: Jun 17, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Classroom 321 - Full Renovation and AV EquipmentConstruction Project
Project Title: Carleton Hall - Classroom 307
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Classroom 307 - AV UpgradesConstruction Project
Project Title: Tilley Hall - T303 Power to Tables
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
T303 Power to TablesConstruction Project
Project Title: Tilley Hall - Theatre 102
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Theatre 102 - Equipment UpgradesConstruction Project
Project Title: Law Building - McAllister Room
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Update McAllister RoomConstruction Project
Project Title: Currie Center - Performance Gym
Estimated Start Date: Jun 24, 2024 04:00 am
Estimated End Date: Jul 01, 2024 04:00 am
Details:
Refinish Performance Gym FloorConstruction Project
Project Title: Alumni Memorial - Washroom Renovation
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
1st Floor Washroom RenovationConstruction Project
Project Title: Grad House - Exterior
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Repair and Paint ExteriorConstruction Project
Project Title: Annex C - Exterior
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Exterior PaintingConstruction Project
Project Title: Law Building - Roof Replacement
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Roof ReplacementConstruction Project
Project Title: Memorial Hall - Washroom Upgrades
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Renovate existing men's washroom to create male and female washroomsConstruction Project
Project Title: Magee - Roof Repairs
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Roof RepairsConstruction Project
Project Title: Currie Center - Mass Timber
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Mass Timber RepairConstruction Project
Project Title: Student Union Building - Outdoor Social Space
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Outdoor Social SpaceConstruction Project
Project Title: Forestry Geology - Washroom Upgrades
Estimated Start Date: May 01, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
2nd and 3rd Floor Washroom UpgradesConstruction Project
Project Title: Gillin Hall - E131 Boardroom Upgrade
Estimated Start Date: May 29, 2024 04:00 am
Estimated End Date: Aug 30, 2024 04:00 am
Details:
Boardroom upgrade including lighting, AV, mechanical and furniture